Blog

Regulation, engineering and the advisories worth knowing about.

Product updates

The TARA agent now shows its plan

Before it touches the model, the agent writes its plan and ticks it off step by step, so you always know what it is doing.

14 Oct 2026 · 4 min read
Regulation

What a UNECE R155 auditor asks to see

The evidence an approval authority looks for, and where each piece lives in a connected model.

12 Oct 2026 · 7 min read
Engineering

Setting SL-T per zone under IEC 62443-3-2

How to pick a target security level for each zone, and read the gap per foundational requirement.

5 Oct 2026 · 9 min read
Vulnerabilities

One advisory, two programmes: matching CVEs to your BOM

Why an advisory is only useful once you know which products ship the affected component.

28 Sep 2026 · 6 min read
Engineering

Feasibility should be derived, never typed

Rating attack paths on the five attack-potential factors, and why the number must come from the steps.

21 Sep 2026 · 8 min read
Regulation

CLC/TS 50701 and IEC 63452 for rail suppliers

What the rail standards ask of a supplier, and how they build on IEC 62443.

14 Sep 2026 · 10 min read
Vulnerabilities

Reading a chip vendor PSIRT advisory

Affected parts, fixed versions and VEX statements, and what to do when a part is not listed.

7 Sep 2026 · 5 min read
Regulation

The Cyber Resilience Act for component makers

Reporting duties, support periods and the SBOM, explained for teams that ship hardware.

31 Aug 2026 · 8 min read
Product updates

Variants without copying the analysis

Keep one baseline and let each market variant carry only what differs, with its own released revision.

23 Aug 2026 · 5 min read
Engineering

Zones and conduits on a ship’s bridge network

Applying IACS UR E26 and E27 to an integrated bridge, from the shore link to propulsion control.

16 Aug 2026 · 9 min read